In Germany there are only regulations regarding the size of solar panels on roofs. A solar panel may not be larger than 2m². There are no size restrictions for other installation locations.
Electricity production is influenced by the intensity and duration of sunlight and temperature. Solar panels produce the most energy in summer, spring or fall and less in winter. To achieve higher efficiency, we recommend using 2 solar modules to achieve a total output of more than 800W. This allows other factors such as less than ideal sunlight or temperature to be compensated to a certain extent.
As long as your house has optimal sunlight and enough space, you can install the system. Don't forget to check the latest regulations in your country or municipality, or ask your energy provider about the restrictions on balcony photovoltaic systems in your area.
The system is designed for long-term outdoor use thanks to the glass plate, the carbon steel base and the cast iron microinverter with protective coating. It is built to withstand constant sunlight, rain, hail and wind. However, in extreme weather conditions such as tornadoes, hurricanes or hailstorms, the PV system can be damaged. In this case, additional measures must be taken to
As long as the intensity of sunlight reaches a certain level, the PV system will generate electricity.
The PV system can be installed on your balcony, terrace, roof or garden. If you want to install them outside the balcony, you must first obtain permission from your landlord or homeowners association. (Note: As long as the system is installed correctly, it will not cause any damage to the building).
Don’t forget to register the system with your utility company before installing it. The PV system must also be registered with the Federal Network Agency within one month of installation.
Check out the link and follow the guidelines to register your solar system with the Federal Agency:https://www.marktstammdatenregister.de/MaStR
There may currently be regional subsidies and subsidies for balcony power plants, but these benefits may change. Please inquire directly
The balcony PV system has the following official certifications:
- DE4105&VDE0124
- OVE guideline R 25
-CE LVD COC
- IEC 62109-1
- IEC 62109-2
- CE RED (including LVD, Health, EMC and RF)
-RoHS
-Reach
- POPS
- TÜV (only applies to some models)
And it passed the TÜV wind tunnel test at level 8.
Don't hesitate to get in touch with us at benyshop@beny.com